SENIOR DUTY METEOROLOGIST NWS ALERT ADMINISTRATIVE MESSAGE
NWS NCEP CENTRAL OPERATIONS COLLEGE PARK MD
2012Z WED OCT 14 2020
...EMERGENCY WCOSS PRODUCTION SWITCH - FINAL UPDATE...
IBM has restored the Luna supercomputer in Reston and the site is
currently a viable backup.
Root cause was a failed system cooling component which triggered
an emergency shutdown of the system. IMB replaced the component
to bring the system back online. NCO has completed cleanup and
model production is running normally.
Final model delays (*this list is not fully inclusive as not all
models are tracked for timliness):
- 16Z RAP (100 min late)
- 16Z HRRR (65 min late)
- 17Z LAMP (60 min late)
- 18Z LAMP (15 min late)
- NWM (120 min late)
- SWMF (60 min late)
- 12Z HWRf/HMON (120 min late)
- 16Z ETSS (100 min late)
- NWPS (60 min late)
- ESTOFS (100 min late)
- PETSS (30 min)
Liddick/SDM/NCO/NCEP